BEGIN:VCALENDAR
VERSION:2.0
CALSCALE:GREGORIAN
PRODID:adamgibbons/ics
METHOD:PUBLISH
X-PUBLISHED-TTL:PT1H
BEGIN:VEVENT
UID:784@burque.fun
SUMMARY:Duck Pond Grand Opening
DTSTAMP:20260815T103045Z
DTSTART:20250903T163000Z
DTEND:20250903T173000Z
DESCRIPTION:The Duck Pond Revitalization Project aims to replace aging infr
	astructure\,\nenhance water quality\, improve safety and accessibility\, a
	nd reduce maintenance\ndemands. With a projected construction period from 
	late Fall 2024 to Summer\n2025\, the project is expected to significantly 
	refresh one of the campus’s most\niconic and historically significant land
	marks.\n\nhttps://pdc.unm.edu/projects/duck-pond/index.html\n[https://pdc.
	unm.edu/projects/duck-pond/index.html]
URL:https://burque.fun/event/duck-pond-grand-opening
LOCATION:Duck Pond - UNM Duck Pond
STATUS:CONFIRMED
CATEGORIES:duck pond,grand opening,unm
X-ALT-DESC;FMTTYPE=text/html:<p>The Duck Pond Revitalization Project aims t
	o replace aging infrastructure, enhance water quality, improve safety and 
	accessibility, and reduce maintenance demands. With a projected constructi
	on period from late Fall 2024 to Summer 2025, the project is expected to s
	ignificantly refresh one of the campus’s most iconic and historically sign
	ificant landmarks.</p><p><a href="https://pdc.unm.edu/projects/duck-pond/i
	ndex.html" target="_blank">https://pdc.unm.edu/projects/duck-pond/index.ht
	ml</a></p>
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Duck Pond Grand Opening
TRIGGER:-PT1H
END:VALARM
END:VEVENT
END:VCALENDAR
